5Y89 1410 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 29th April 2024

operated by
South Western Railway
10 coaches
701043
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
21
1410
1407½
-2
WR1
0.40
pass
1411½
pass
1408¾
-2
WR1
DWF
1.29
3
pass
1412½
pass
1410½
-2
1.78
pass
1413½
pass
1411½
-2
DWF
DW
2.50
3
pass
1414½
pass
1412½
-1
DW
DWS
3.17
pass
1415½
pass
1413
-2
3.74
6
pass
1416½
pass
1420
+3
DWS
DWS
4.60
1
pass
1418
pass
1421½
+3
DWS
EPR
5.09
1
pass
1419
pass
1421
+2
DR
5.60
pass
1423½
pass
1421½
-1
6.58
pass
1426½
No report
7.50
2
pass
1429
pass
1428½
DD
8.24
1431
1431
No report
EP