2S33 1222 London Waterloo to Weybridge
Departing on 25th April 2024

operated by
South Western Railway
8 coaches
450034
450041
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
1222
1222
1221½
UW
0.40
pass
1223½
pass
1223¼
UW
DWS
1.29
4
1226
1226
1225½
1227½
1225¼
1226½
-1
1.78
pass
1229
pass
1227½
-1
DWS
DW
2.50
3
1229
1229
1230
1230½
1228¾
1229¼
-1
DW
DWF
3.17
pass
1231½
pass
1230¼
-1
3.74
5
1232
1232
1232½
1233½
1231¾
1232½
4.60
2
1235
1235
1235½
1236
1234¼
1235
5.72
3
1237
1238
1238
1239
1237
1237¾
-1
7.07
3
1241
1242
1241½
1242½
1240¼
1241
-1
DWF
DH
7.54
2
1244
1244
1244
1244½
1242½
1243¼
-1
8.47
2
1247
1247
1246½
1247½
1245¼
1246½
9.34
pass
1249
pass
1248¼
9.53
2
1250
1250
1249½
1250
1248¾
1249¾
10.01
pass
1251
pass
1250¼
10.52
2
1252
1253
1252
1253
1251½
1252½
11.34
2
1255
1255
1254½
1255
1254¼
1255
12.10
2
1257
1257
1256½
1257
1256½
1257¼
13.40
2
1300
1302
1259½
1302
1259¼
1301½
14.19
pass
1303½
pass
1302½
14.48
pass
1304½
pass
1303¾
DH
DT
16.01
2
1308
1308
1307½
1308½
1307¼
1308¼
18.53
2
1311
1312
1312
1312½
1312
1312½
20.15
2
1316
1316
1315½
1316½
1315½
1316¼
22.15
2
1321
1321
1320½
1321
1320½
1321
24.28
4
1325
1325
1325
1325½
1325
1325½
DT
DC
26.68
1
1330
1331
1330
1331
1330
1330¾
28.22
1
1334
1334
1333½
1334
1333
1334
29.25
pass
1335½
pass
1335¾
30.05
Approaching
Weybridge [WYB]
1
1338
1338
1338
DC