2U35 1303 London Waterloo to Windsor & Eton Riverside
Departing on 26th April 2024

operated by
South Western Railway
8 coaches
450118
450077
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
1303
1303
1302¾
WR1
0.40
pass
1304½
pass
1303¾
WR1
DWF
1.29
3
1307
1307
1306½
1307½
1306
1307¼
1.78
pass
1309
pass
1308¼
DWF
DW
2.50
3
pass
1310
pass
1309¼
DW
DWS
3.17
pass
1310½
pass
1309¾
3.74
6
1312
1313
1312
1313
1311¼
1312¾
DWS
DWS
4.60
1
pass
1314½
pass
1316
+1
5.72
4
1316
1317
1316
1317
1319¾
1320½
+3
7.07
4
pass
1319
pass
1323
+4
DWS
DR
8.21
2
pass
1320
pass
1324
+4
9.03
2
pass
1321
pass
1324¾
+4
9.57
1
1322
1323
1322
1323
1326
1327¼
+4
DR
DT
10.66
3
pass
1325
pass
1329¼
+4
11.22
5
1326
1327
1326
1327
1330
1331
+4
11.49
pass
1328
pass
1331½
+3
12.43
2
1330
1330
1329½
1330
1333
1334
+4
13.03
pass
1331
pass
1335
+4
13.35
pass
1331½
pass
1335½
+4
14.68
2
1334
1334
1333½
1334½
1337¼
1338¼
+3
17.40
2
1338
1338
1338
1338½
1341¾
1342½
+4
19.02
2
1341
1342
1341½
1342½
1345
1346¼
+3
DT
DW
21.40
2
1346
1346
1346
1346½
1349
1350
+3
22.48
2
1349
1349
1348½
1349
1353
1354
+5
23.63
2
1352
1352
1351½
1352
1356
1356
+4
25.48
1
1356
1356
1400
+4