2U53 1733 London Waterloo to Windsor & Eton Riverside
Departing on 23rd April 2024

operated by
South Western Railway
8 coaches
450107
450025
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
1733
1733
1733¼
WR1
0.40
pass
1734½
pass
1734¼
WR1
DWF
1.29
3
1737
1737
1736½
1737½
1737¼
1738¼
1.78
pass
1739
pass
1739½
DWF
DW
2.50
3
pass
1740
pass
1740¾
DW
DWS
3.17
pass
1740½
pass
1741¼
3.74
6
1742
1743
1742
1743
1742¾
1744½
+1
DWS
DWS
4.60
1
pass
1744½
pass
1746
+1
5.72
4
1746
1747
1746
1747
1747¾
1748½
+1
7.07
4
pass
1749
pass
1750½
+1
DWS
DR
8.21
2
pass
1750
pass
1751½
+1
9.03
2
pass
1751
pass
1752½
+1
9.57
1
1752
1753
1752
1753
1753½
1754¾
+1
DR
DT
10.66
3
pass
1755
pass
1756½
+1
11.22
5
1756
1757
1756
1757
1757¼
1758¾
+1
11.49
pass
1758
pass
1759½
+1
12.43
2
1800
1800
1759½
1800
1800¾
1801¾
+1
13.03
pass
1801
pass
1803
+2
13.35
pass
1801½
pass
1803¼
+1
14.68
2
1804
1804
1803½
1804½
1805¼
1806¼
+1
17.40
2
1808
1808
1808
1808½
1809½
1810½
+2
19.02
2
1811
1812
1811½
1812½
1813
1813¾
+1
DT
DW
21.40
2
1816
1816
1816
1816½
1817
1818
+1
22.48
2
1819
1819
1818½
1819
1820
1821
+2
23.63
2
1822
1822
1821½
1822
1822
1823
+1
25.48
1
1828
1826
1827
+1