2U65 2033 London Waterloo to Windsor & Eton Riverside
Departing on 16th April 2024

operated by
South Western Railway
10 coaches
458514
458536
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
2033
2033
2033
WR1
0.40
pass
2034½
pass
2034¼
WR1
DWF
1.29
3
2037
2037
2036½
2037½
2037¼
2038¼
1.78
pass
2039
pass
2039½
DWF
DW
2.50
3
pass
2040
pass
2040½
DW
DWS
3.17
pass
2040½
pass
2041
3.74
6
2042
2043
2042
2043
2042¾
2043¾
DWS
DWS
4.60
1
pass
2044½
pass
2045½
+1
5.72
4
2046
2047
2046
2047
2047¼
2048
+1
7.07
4
pass
2049
pass
2050
+1
DWS
DR
8.21
2
pass
2050
pass
2051
+1
9.03
2
pass
2051
pass
2052
+1
9.57
1
2052
2053
2052
2053
2053
2054
+1
DR
DT
10.66
3
pass
2055
pass
2055¾
11.22
5
2056
2057
2056
2057
2056¾
2057¾
11.49
pass
2058
pass
2058½
12.43
2
2100
2100
2059½
2100
2100
2100¾
13.03
pass
2101
pass
2101¾
13.35
pass
2101½
pass
2102¼
14.68
2
2104
2104
2103½
2104½
2104¼
2105
17.40
2
2108
2108
2108
2108½
2108½
2109½
+1
19.02
2
2111
2112
2111½
2112½
2112¼
2113½
+1
DT
DW
21.40
2
2116
2116
2116
2116½
2117
2117
22.48
2
2119
2119
2118½
2119
2120
2120
+1
23.63
2
2122
2122
2121½
2122
2123
2123
+1
25.48
2
2126
2126
2127
+1