2U67 2103 London Waterloo to Windsor & Eton Riverside
Departing on 19th April 2024

operated by
South Western Railway
8 coaches
450007
450026
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
2103
2103
2103¼
WR1
0.40
pass
2104½
pass
2104¾
WR1
DWF
1.29
3
2107
2107
2106½
2107½
2107¼
2108¼
1.78
pass
2109
pass
2109½
DWF
DW
2.50
3
pass
2110
pass
2110¾
DW
DWF
3.17
pass
2110½
pass
2111½
3.74
5
2112
2113
2112
2113
2113¼
2114½
+1
4.60
2
pass
2114½
pass
2116¼
+2
5.72
3
2116
2117
2116
2117
2118½
2120¼
+3
DF
7.07
4
pass
2119
pass
2123½
+4
DWF
DR
8.21
2
pass
2120
pass
2125
+4
9.03
2
pass
2121
pass
2125¾
+4
9.57
1
2122
2123
2122
2123
2126¾
2128
+5
DR
DT
10.66
3
pass
2125
pass
2129¾
+4
11.22
5
2126
2127
2126
2127
2130¾
2131¾
+4
11.49
pass
2128
pass
2132½
+4
12.43
2
2130
2130
2129½
2130
2134
2135
+5
13.03
pass
2131
pass
2136
+5
13.35
pass
2131½
pass
2136½
+5
14.68
2
2134
2134
2133½
2134½
2138¼
2139¾
+5
17.40
2
2138
2138
2138
2138½
2143¼
2144
+5
19.02
2
2141
2142
2141½
2142½
2146¾
2148¼
+5
DT
DW
21.40
2
2146
2146
2146
2146½
2152
2153
+6
22.48
2
2149
2149
2148½
2149
2155
2158
+9
23.63
2
2152
2152
2151½
2152
2200
2201
+9
25.48
1
2156
2156
2205
+9