2U33 1233 London Waterloo to Windsor & Eton Riverside
Departing on 10th May 2025

operated by
South Western Railway
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
1233
1233
1232¾
WR1
0.40
pass
1234½
pass
1234
WR1
DWF
1.29
3
1237
1237
1236½
1237½
1236
1237½
1.78
pass
1239
pass
1238½
DWF
DW
2.50
3
pass
1240
pass
1239¾
DW
DWS
3.17
pass
1240½
pass
1240¼
3.74
6
1242
1243
1242
1243
1242
1243¼
DWS
DWS
4.60
1
pass
1244½
pass
1245
5.72
4
1246
1247
1246
1247
1246¾
1247¾
DS
7.07
4
pass
1249
pass
1249¾
DWS
DR
8.21
2
pass
1250
pass
1250¾
9.03
2
pass
1251
pass
1251¾
9.57
1
1252
1253
1252
1253
1252¾
1254¼
+1
DR
DT
10.66
3
pass
1255
pass
1256¼
+1
11.22
5
1256
1258
1256
1258
1257¼
1258½
11.49
pass
1259
pass
1259¼
12.43
2
1301
1301
1300½
1301
1300¾
1301½
13.03
pass
1302
pass
1302½
13.35
pass
1302½
pass
1303
14.68
2
1305
1305
1304½
1305½
1305
1305¾
17.40
2
1309
1309
1309
1309½
1309¼
1310
19.02
2
1312
1313
1312½
1313½
1312½
1313¼
DT
DW
21.40
2
1317
1317
1317
1317½
1317
1317
22.48
2
1320
1320
1319½
1320
1319
1320
23.63
2
1323
1323
1322½
1323
1322
1323