120A 1419 Hastings to Eastbourne
Departing on 10th September 2020

operated by
Locomotive Services
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hastings [HGS]
Pathed as Diesel locomotive, trailing load 715 tonnes at 60mph
3
1419
1418¼
UH
0.58
1
pass
1421
pass
1420¾
1.44
pass
1423
pass
1422¾
UH
UB
4.51
1
pass
1429
pass
1427¾
-1
5.36
1
pass
1430
pass
1430
6.67
1
pass
1432
pass
1433
+1
8.43
1
pass
1434
pass
1437¾
+3
10.52
1
pass
1437
pass
1442¼
+5
11.33
1
pass
1438
pass
1442
+4
14.04
pass
1448
pass
1448
UB
DE
14.40
2
pass
1449
pass
1450¾
+1
16.38
1
1454
1455¾
+1
DE