5S80 2330 Grove Park C.S.D. to London BridgeDeparting on 7th January 2026
operated by
Southeastern
This service is partially cancelled
This service was cancelled between London Bridge and London Charing Cross due to a problem with the traction equipment (MD).
WTT
Realtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line