1Z78 1926 Hastings to London Bridge
Departing on 1st January 2026

operated by
Southeastern
4 coaches
375616
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hastings [HGS]
Pathed as Electric multiple unit at 100mph
4
1926
1926
1926
0.58
1
1929
1929
1928½
1929½
1928
1929
1.44
pass
1931½
pass
1931
1.54
pass
1931½
pass
1931
4.63
pass
1936
pass
1935
6.67
1939
1939
1939
1939½
1939
1939
10.55
pass
1943½
pass
1943
12.66
pass
1946
pass
1946
14.79
pass
1948
pass
1947
18.47
pass
1951
pass
1950
21.73
pass
1953½
pass
1953
23.10
1955
1956
1955
1956
1955
1956
25.60
pass
1959
pass
1959
27.14
pass
2000½
pass
2000
28.01
1
2003
2007
2003
2007
2003
2007
28.57
pass
2008
pass
2008
29.43
2010
2011
2010
2011
2010
2011
32.10
pass
2014½
pass
2014
32.71
2
2017
2018
2016½
2018
2016
2018
33.60
pass
2019
pass
2019
35.31
pass
2020½
pass
2020
37.04
pass
2021½
pass
2021
42.04
pass
2025½
pass
2025
46.74
pass
2030½
pass
2030
50.40
pass
2035
pass
2035
52.47
UML
pass
2038
pass
2038
SL
54.28
pass
2039½
pass
2039
58.04
pass
2043
pass
2043
59.03
pass
2044
pass
2044
FL
59.74
1
pass
2044½
pass
2044
60.69
pass
2045½
pass
2045
62.02
pass
2047
pass
2046
62.75
1
pass
2048
pass
2048
FL
63.34
pass
2049
pass
2049
FL
63.78
pass
2050
pass
2050
64.48
3
pass
2050½
pass
2050
FL
65.56
pass
2051½
pass
2051
66.08
pass
2052
pass
2051
66.71
pass
2052½
pass
2052
FL
67.53
pass
2053
pass
2053
68.44
pass
2054
pass
2053
69.47
pass
2055
pass
2054
70.33
4
pass
2055½
pass
2055
71.11
pass
2056½
pass
2056
SRV
71.46
pass
2057½
pass
2057
72.07
pass
2059
pass
2059
10
72.36
pass
2059½
pass
2059
72.61
pass
2100½
pass
2100
73.11
10
2102
2102
2102