1H88 1350 Hastings to London Bridge
Departing on 30th December 2025

operated by
Southeastern
8 coaches
375605
375618

This service is partially cancelled

This service was cancelled between London Bridge and London Charing Cross due to a problem with the schedule (QM).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hastings [HGS]
Pathed as Electric multiple unit at 100mph
3
1350
1350
1350¼
UH
0.58
1
1353
1353
1352½
1353½
1352½
1353¼
1.44
pass
1355½
pass
1355¼
UH
1.54
1
1356
1357
1356
1357
1356
1357½
4.63
1
1402
1402
1402
1402½
1402
1402¾
6.67
1
1406
1407
1406
1407
1406
1407¼
10.55
pass
1411
pass
1411¾
12.66
1
1414
1414
1414
1414½
1414¼
1415¾
+1
14.79
1
1418
1418
1417½
1418½
1418½
1419¼
18.47
1
1423
1423
1423
1423½
1423¾
1424½
+1
21.73
pass
1427½
pass
1428¾
+1
23.10
1
1429
1430
1429
1430
1430¼
1431½
+1
25.60
1
1434
1434
1433½
1434
1435¼
1436
+2
27.14
pass
1436½
pass
1438½
+2
28.01
1
1439
1439
1438½
1439½
1439¾
1441¼
+1
28.57
pass
1440½
pass
1442
+1
29.43
1
1443
1443
1442½
1443
1444
1445
+2
32.10
pass
1446½
pass
1448¾
+2
32.71
2
1449
1450
1448½
1450
1500¼
1501¾
+11
UH
UM
35.35
1
pass
1453
pass
1505
+12
40.28
1
1458
1459
1458
1459½
1509¾
1510¾
+11
UM
UM
41.71
1
pass
1501
pass
1512¾
+11
45.73
1
pass
1504½
pass
1516
+11
47.12
1
pass
1505½
pass
1517
+11
48.52
2
1507
1508
1507
1508
1518½
1520
+12
UM
UF
49.64
1
pass
1509½
pass
1521½
+12
50.13
pass
1510
pass
1522
+12
51.18
1
pass
1511
pass
1523
+12
52.16
1
pass
1512
pass
1524
+12
53.39
2
pass
1513
pass
1525¼
+12
UF
UF
54.73
pass
1514
pass
1526¼
+12
55.21
1
pass
1514½
pass
1527¼
+12
56.01
pass
1516
pass
1528½
+12
FL
UKF
56.70
pass
1517
pass
1529½
+12
57.08
pass
1517½
pass
1529¾
+12
57.49
pass
1518½
pass
1530½
+12
UF
UKF
59.05
pass
1520½
pass
1532¾
+12
UKF
8
59.46
pass
1521
pass
1533¼
+12
59.75
pass
1521½
pass
1533¾
+12
60.20
pass
1522
pass
1534½
+12
60.48
9
1523
1525
1523
1525
1536
+13
61.06
pass
1526½
-
61.14
pass
1527
-
61.56
1529
1530
1529
1530
-