2E61 2301 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
3
2301
2301
2301
D2
0.28
pass
2302
No report
0.53
pass
2302½
pass
2302¼
1.02
pass
2302½
pass
2302½
1.43
pass
2303½
pass
2303
2.06
pass
2304
pass
2304
2.36
pass
2304½
pass
2304¾
2
DGW
3.07
2
2306
2306
2306
2306½
2306¼
2307
3.47
1
2308
2309
2308
2309
2308½
2309¼
4.38
2
2312
2312
2311½
2312
2311¾
2312
5.07
2
2314
2314
2313½
2314
2314
2314¾
5.46
pass
2315½
pass
2315½
5.55
2
2316
2317
2316
2317
2316¼
2316¾
DGW
DNK
6.67
2
2320
2320
2320
2320½
2319½
2320¼
7.43
2
2323
2323
2322½
2323½
2322¼
2323
8.12
2
2325
2325
2325
2325½
2324½
2325¼
9.54
2
2329
2329
2328½
2329½
2328¼
2329
11.06
2
2332
2332
2332
2332½
2331½
2332
12.29
2
2335
2335
2335
2335½
2335
2335¼
13.41
2
2338
2339
2338
2339½
2337¼
2338¾
13.77
pass
2340½
pass
2339½
14.53
pass
2342
pass
2341¼
15.15
pass
2342½
pass
2342
DNK
REV
15.54
2
2346
2346
2344
-1
REV