2E53 2101 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
3
2101
2101
2101
D2
0.28
pass
2102
No report
0.53
pass
2102½
pass
2102¾
1.02
pass
2102½
pass
2103
1.43
pass
2103½
pass
2103½
2.06
pass
2104
pass
2104¾
2.36
pass
2104½
pass
2105½
+1
2
DGW
3.07
2
2106
2106
2106
2106½
2107
2107¾
+1
3.47
1
2108
2109
2108
2109
2109½
2110
+1
4.38
2
2112
2112
2111½
2112
2112¾
2113
+1
5.07
2
2114
2114
2113½
2114
2115
2115½
+1
5.46
pass
2115½
pass
2116½
+1
5.55
2
2116
2117
2116
2117
2117
2117¾
DGW
DNK
6.67
2
2120
2120
2120
2120½
2120½
2121¼
7.43
2
2123
2123
2122½
2123½
2123¼
2124
8.12
2
2125
2125
2125
2125½
2125½
2126¼
9.54
2
2129
2129
2128½
2129½
2129¼
2130
11.06
2
2132
2132
2132
2132½
2132¾
2133
12.29
2
2135
2135
2135
2135½
2136
2136½
+1
13.41
2
2138
2139
2138
2139½
2138¾
2139½
13.77
pass
2140½
pass
2140¼
14.53
pass
2142
pass
2141¾
15.15
pass
2142½
pass
2142¾
DNK
REV
15.54
2
2146
2146
2144¾
-1
REV