2E47 1931 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
3
1931
1931
1931
D2
0.28
pass
1932
No report
0.53
pass
1932½
pass
1932¼
1.02
pass
1932½
pass
1932¾
1.43
pass
1933½
pass
1933
2.06
pass
1934
pass
1934½
2.36
pass
1934½
pass
1935½
+1
2
DGW
3.07
2
1936
1936
1936
1936½
1937
1937¾
+1
3.47
1
1938
1939
1938
1939
1939¼
1940
+1
4.38
2
1942
1942
1941½
1942
1942¾
1943
+1
5.07
2
1944
1944
1943½
1944
1944¾
1945½
+1
5.46
pass
1945½
pass
1946½
+1
5.55
2
1946
1947
1946
1947
1947
1947¾
DGW
DNK
6.67
2
1950
1950
1950
1950½
1950¼
1951
7.43
2
1953
1953
1952½
1953½
1953
1954
8.12
2
1955
1955
1955
1955½
1955½
1956¼
9.54
2
1959
1959
1958½
1959½
1959
1959¾
11.06
2
2002
2002
2002
2002½
2002¼
2002¾
12.29
2
2005
2005
2005
2005½
2005½
2006
13.41
2
2008
2009
2008
2009½
2008
2009¼
13.77
pass
2010½
pass
2010
14.53
pass
2012
pass
2011½
15.15
pass
2012½
pass
2012½
DNK
REV
15.54
2
2016
2016
2014¼
-1
REV