2E23 1331 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
3
1331
1331
1331
D2
0.28
pass
1332
No report
0.53
pass
1332½
pass
1332¼
1.02
pass
1332½
pass
1332¾
1.43
pass
1333½
pass
1333
2.06
pass
1334
pass
1334¼
2.36
pass
1334½
pass
1334¾
2
DGW
3.07
2
1336
1336
1336
1336½
1336¼
1337¼
3.47
1
1338
1339
1338
1339
1338¾
1339½
4.38
2
1342
1342
1341½
1342
1342
1342
5.07
2
1344
1344
1343½
1344
1344¼
1345
+1
5.46
pass
1345½
pass
1346
5.55
2
1346
1347
1346
1347
1346¾
1347½
DGW
DNK
6.67
2
1350
1350
1350
1350½
1350¼
1351
7.43
2
1353
1353
1352½
1353½
1353
1353¾
8.12
2
1355
1355
1355
1355½
1355½
1356
9.54
2
1359
1359
1358½
1359½
1359
1359¾
11.06
2
1402
1402
1402
1402½
1402¼
1402¾
12.29
2
1405
1405
1405
1405½
1405½
1406
13.41
2
1408
1409
1408
1409½
1408
1409
13.77
pass
1410½
pass
1409¾
14.53
pass
1412
pass
1411¼
15.15
pass
1412½
pass
1412¼
DNK
REV
15.54
2
1416
1416
1414½
-1
REV