2E15 1131 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
2
1131
1131
1131
2
0.28
pass
1132
No report
0.53
pass
1132½
pass
1132¼
1.02
pass
1132½
pass
1132¾
1.43
pass
1133½
pass
1133
2.06
pass
1134
pass
1134¼
2.36
pass
1134½
pass
1135
2
DGW
3.07
2
1136
1136
1136
1136½
1136½
1137
3.47
1
1138
1139
1138
1139
1138½
1139¼
4.38
2
1142
1142
1141½
1142
1141¾
1142
5.07
2
1144
1144
1143½
1144
1143¾
1144¼
5.46
pass
1145½
pass
1145¼
5.55
2
1146
1147
1146
1147
1145¾
1146¾
DGW
DNK
6.67
2
1150
1150
1150
1150½
1149¼
1149¾
7.43
2
1153
1153
1152½
1153½
1151¾
1152¾
8.12
2
1155
1155
1155
1155½
1154¼
1154¾
9.54
2
1159
1159
1158½
1159½
1157¾
1159
11.06
2
1202
1202
1202
1202½
1201½
1201¾
12.29
2
1205
1205
1205
1205½
1204½
1205
13.41
2
1208
1209
1208
1209½
1207
1208¾
13.77
pass
1210½
pass
1209½
14.53
pass
1212
pass
1211
-1
15.15
pass
1212½
pass
1211¾
DNK
REV
15.54
2
1216
1216
1215½
REV