2E07 0931 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
3
0931
0931
0931
D2
0.28
pass
0932
No report
0.53
pass
0932½
pass
0932
1.02
pass
0932½
pass
0932½
1.43
pass
0933½
pass
0932¾
2.06
pass
0934
pass
0934
2.36
pass
0934½
pass
0934¾
2
DGW
3.07
2
0936
0936
0936
0936½
0936¼
0936¾
3.47
1
0938
0939
0938
0939
0938¼
0938¾
4.38
2
0942
0942
0941½
0942
0941¼
0941
-1
5.07
2
0944
0944
0943½
0944
0943½
0944
5.46
pass
0945½
pass
0945
5.55
2
0946
0947
0946
0947
0945½
0946¾
DGW
DNK
6.67
2
0950
0950
0950
0950½
0949½
0950¼
7.43
2
0953
0953
0952½
0953½
0952
0953
8.12
2
0955
0955
0955
0955½
0954½
0955
9.54
2
0959
0959
0958½
0959½
0957¾
0959¼
11.06
2
1002
1002
1002
1002½
1001½
1001¾
12.29
2
1005
1005
1005
1005½
1004½
1005
13.41
2
1008
1009
1008
1009½
1007
1008¾
13.77
pass
1010½
pass
1009½
14.53
pass
1012
pass
1011
15.15
pass
1012½
pass
1011¾
DNK
REV
15.54
2
1016
1016
1015
REV