2E03 0831 London Bridge to Dartford
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 75mph
3
0831
0831
0831
D2
0.28
pass
0832
No report
0.53
pass
0832½
pass
0832½
1.02
pass
0832½
pass
0833
1.43
pass
0833½
pass
0833¼
2.06
pass
0834
pass
0834½
2.36
pass
0834½
pass
0835¼
2
DGW
3.07
2
0836
0836
0836
0836½
0836¾
0837½
+1
3.47
1
0838
0839
0838
0839
0839¼
0840
+1
4.38
2
0842
0842
0841½
0842
0842½
0843
+1
5.07
2
0844
0844
0843½
0844
0844¾
0845¼
+1
5.46
pass
0845½
pass
0846¼
+1
5.55
2
0846
0847
0846
0847
0847
0847½
DGW
DNK
6.67
2
0850
0850
0850
0850½
0850¼
0851
7.43
2
0853
0853
0852½
0853½
0853
0854
8.12
2
0855
0855
0855
0855½
0855½
0856
9.54
2
0859
0859
0858½
0859½
0859¼
0900
11.06
2
0902
0902
0902
0902½
0902½
0903
12.29
2
0905
0905
0905
0905½
0905¾
0906¼
13.41
2
0908
0909
0908
0909½
0908½
0909¼
13.77
pass
0910½
pass
0910¼
14.53
pass
0912
pass
0911¾
15.15
pass
0912½
pass
0912½
DNK
REV
15.54
2
0916
0916
0914½
-1
REV