1Z29 1242 London Bridge to Hastings
Departing on 3rd January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
10
1242
1242
1241¾
9
0.30
pass
1243½
pass
1243
9
10
0.55
pass
1244
pass
1244
1.04
pass
1244½
pass
1244¼
10
SRV
1.45
pass
1246
pass
1246¼
2.00
pass
1247
pass
1247½
SRV
DF
2.58
3
pass
1248
pass
1248¼
3.44
pass
1249
pass
1249
4.47
pass
1250
pass
1250
5.38
pass
1250½
pass
1250¾
6.20
pass
1251½
pass
1251¾
FL
7.03
pass
1252½
pass
1252¼
7.35
pass
1253
pass
1252¾
8.43
4
pass
1254
pass
1253¾
DF
DBF
9.13
pass
1255
pass
1254½
9.57
pass
1255½
pass
1254¾
DBF
DF
10.16
3
pass
1256
pass
1258¾
+2
FL
DF
11.09
2
pass
1257
pass
1300¾
+3
12.22
2
pass
1258
pass
1301¾
+3
13.17
2
pass
1259
pass
1302¾
+3
14.08
pass
1300½
pass
1303½
+3
DF
DRH
15.07
2
pass
1302
pass
1304½
+2
18.63
2
pass
1308
pass
1307½
20.44
3
pass
1311
pass
1311¾
DRH
DT
22.51
pass
1314
No report
26.17
2
pass
1319½
pass
1323
+3
DT
31.07
2
pass
1327
pass
1329½
+2
36.07
pass
1333½
No report
37.60
pass
1335½
No report
39.31
pass
1337½
pass
1338¾
+1
DGS
DRR
40.20
2
1339
1341
1339
1341
1341
1342
+1
DRR
DH
41.01
pass
1342½
pass
1344¼
+1
DD
43.48
2
1346
1347
1346
1347
1347¼
1348¼
+1
44.34
pass
1348½
pass
1349¾
+1
45.10
2
1350
1354
1350
1354
1351¼
1353¾
45.77
pass
1356
pass
1355½
47.31
2
1358
1358
1358
1358½
1357¾
1358¼
50.01
2
1403
1403
1402½
1403½
1402¼
1403¼
51.18
pass
1405
pass
1405
54.44
2
1409
1409
1409
1409½
1408½
1409¼
58.12
2
1414
1414
1413½
1414½
1413½
1414¼
60.25
2
1418
1418
1417½
1418½
1417½
1418
62.36
pass
1421½
pass
1420¾
66.24
2
1426
1426
1425½
1426½
1425
1425¾
68.28
2
1430
1430
1430
1430½
1429½
1430
71.37
2
1436
1436
1435½
1436½
1434¾
1435¾
71.47
pass
1437
pass
1436¼
72.33
2
1439
1440
1439
1440
1438½
1439¾
73.11
4
1443
1443
1442
DH