1Z19 2112 London Bridge to Hastings
Departing on 3rd January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
10
2112
2112
2119
+7
9
0.30
pass
2113½
pass
2120¼
+7
9
10
0.55
pass
2114
pass
2121
+7
1.04
pass
2114½
pass
2121½
+7
10
SRV
1.45
pass
2116
pass
2122¼
+6
2.00
pass
2117
pass
2123¼
+6
SRV
DF
2.58
3
pass
2118
pass
2124
+6
3.44
pass
2119
pass
2124¾
+5
4.47
pass
2120
pass
2125¾
+5
5.38
pass
2120½
pass
2126½
+5
6.20
pass
2121½
pass
2127¼
+5
FL
7.03
pass
2122½
pass
2128
+5
7.35
pass
2123
pass
2128½
+5
8.43
4
pass
2124
pass
2130
+6
DF
DBF
9.13
pass
2125
pass
2131
+6
9.57
pass
2125½
pass
2131¾
+6
DBF
DF
10.16
3
pass
2126
pass
2133¾
+7
FL
DF
11.09
2
pass
2127
pass
2135¼
+8
12.22
2
pass
2128
pass
2136
+8
13.17
2
pass
2129
pass
2137
+8
14.08
pass
2130½
pass
2138
+7
DF
DRH
15.07
2
pass
2132
pass
2140
+8
18.63
2
pass
2138
pass
2146
+8
20.44
DML
pass
2140½
pass
2148¾
+8
DRH
DT
22.51
pass
2144
No report
26.17
2
pass
2150
pass
2155
+5
DT
31.07
2
pass
2156½
pass
2158¼
+1
36.07
pass
2203
No report
37.60
pass
2205
No report
39.31
pass
2207½
pass
2206
-1
DGS
DRR
40.20
1
2209
2211
2209
2211
2208¾
2212
+1
DRR
DH
41.01
pass
2212½
pass
2214¼
+1
DD
43.48
2
2216
2217
2216
2217
2217½
2219
+2
44.34
pass
2218½
pass
2220½
+2
45.10
2
2220
2224
2220
2224
2222
2224¼
45.77
pass
2226
pass
2226
47.31
2
pass
2227½
pass
2228¾
+1
50.01
2
2231
2231
2230½
2231½
2233
2234¼
+2
51.18
pass
2233
pass
2236
+3
54.44
2
pass
2236
pass
2240½
+4
58.12
2
pass
2239
pass
2245¾
+6
60.25
2
pass
2241
pass
2250
+9
62.36
pass
2243
pass
2253¼
+10
66.24
2
2247
2248
2247
2248
2257½
2258¼
+10
68.28
2
pass
2252½
pass
2302½
+10
71.37
2
pass
2258½
pass
2308¾
+10
71.47
pass
2258½
pass
2309½
+11
72.33
2
2301
2301
2300½
2301½
2311¾
2312¾
+11
73.11
4
2305
2305
2315¼
+10
DH