1Z29 1344 London Bridge to Tunbridge Wells
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
10
1344
1344
1343¾
9
0.30
pass
1345½
pass
1345
0.55
pass
1346
pass
1345¼
1.04
pass
1347
pass
1346½
9
DSS
1.45
pass
1348
No report
2.00
pass
1349
pass
1348
DSS
DS
2.58
2
pass
1351
pass
1349¼
-1
DS
DF
3.44
pass
1352
pass
1351¼
4.47
pass
1353½
pass
1352½
-1
5.38
pass
1355
pass
1353¼
-1
6.20
pass
1356
pass
1354¼
-1
FL
7.03
pass
1357½
pass
1354¾
-2
7.35
pass
1358½
pass
1355¼
-2
8.43
4
pass
1400½
pass
1357
-3
DF
DBF
9.13
pass
1403
pass
1358½
-4
9.57
pass
1405
pass
1400¾
-4
DBF
DF
10.16
3
pass
1408½
pass
1403
-5
FL
DF
11.09
2
pass
1409½
pass
1405¼
-4
12.22
2
pass
1411
pass
1408¼
-2
13.17
2
pass
1412
pass
1409¾
-2
14.08
pass
1413
pass
1410½
-2
DF
DRH
15.07
2
pass
1414
pass
1411¼
-2
18.63
2
pass
1417
pass
1414¾
-2
20.44
3
pass
1418½
pass
1417
-1
DRH
DT
22.51
pass
1420½
No report
26.17
2
pass
1424
pass
1422¾
-1
DT
31.07
2
pass
1428½
pass
1426¼
-2
36.07
pass
1432½
No report
37.60
pass
1433½
No report
39.31
pass
1435
No report
40.20
1
1436
1438
1436
1438
1436
1438¾
DRR
DH
41.01
pass
1439½
pass
1440¾
+1
DD
43.48
2
1443
1443
1443
1443½
1444
1445
+1
44.34
pass
1445
pass
1446¾
+1
DH
UH
45.10
1
1447
1447
1448¼
+1
UH