1Z21 2314 London Bridge to Tunbridge Wells
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
10
2314
2314
2313¾
9
0.30
pass
2315½
pass
2315
0.55
pass
2316
pass
2315¼
1.04
pass
2317
pass
2316¼
9
DSS
1.45
pass
2318
No report
2.00
pass
2319
pass
2317½
-1
DSS
DS
2.58
2
pass
2321
pass
2319
-1
DS
DF
3.44
pass
2321½
pass
2321¼
4.47
pass
2322½
pass
2322½
5.38
pass
2323½
pass
2323¼
6.20
pass
2324
pass
2324
FL
7.03
pass
2325½
pass
2324½
7.35
pass
2326
pass
2325¼
8.43
4
pass
2328
pass
2327½
DF
DBF
9.13
pass
2329½
pass
2329
9.57
pass
2330½
pass
2330¾
DBF
DF
10.16
3
pass
2332
pass
2333¾
+1
FL
DF
11.09
2
pass
2334
pass
2336¼
+2
12.22
2
pass
2337
pass
2339¼
+2
13.17
2
pass
2339
pass
2341
+2
14.08
pass
2340
pass
2342¼
+2
DF
DRH
15.07
2
pass
2341
pass
2343
+2
18.63
2
pass
2344
pass
2346¾
+2
20.44
DML
pass
2345½
pass
2349½
+4
DRH
DT
22.51
pass
2347½
No report
26.17
2
pass
2351½
pass
2355¾
+4
DT
31.07
2
pass
2356
pass
2359¼
+3
36.07
pass
0000
No report
37.60
pass
0001½
No report
39.31
pass
0003
No report
40.20
1
0004
0008
0004
0008
0008½
0009
+1
DRR
DH
41.01
pass
0009½
pass
0011¼
+1
DD
43.48
2
0013
0013
0013
0013½
0014½
0015¾
+2
44.34
pass
0015
pass
0017¼
+2
DH
UH
45.10
1
0017
0017
0018¾
+1
UH