1Z41 1644 London Bridge to Tunbridge Wells
Departing on 4th January 2026

operated by
Southeastern
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
10
1644
1644
1643¾
9
0.30
pass
1645½
pass
1644¾
0.55
pass
1646
pass
1645
1.04
pass
1647
pass
1646
9
DSS
1.45
pass
1648
No report
2.00
pass
1649
pass
1647½
-1
DSS
DS
2.58
2
pass
1651
pass
1648¾
-2
DS
DF
3.44
pass
1651½
pass
1650¾
4.47
pass
1652½
pass
1652
5.38
pass
1653½
pass
1652¾
6.20
pass
1654
pass
1653½
FL
7.03
pass
1655½
pass
1654¼
-1
7.35
pass
1656½
pass
1654¾
-1
8.43
4
pass
1659
pass
1656¾
-2
DF
DBF
9.13
pass
1700½
pass
1700
9.57
pass
1701½
pass
1701½
DBF
DF
10.16
3
pass
1704½
pass
1704¾
FL
DF
11.09
2
pass
1706
pass
1707½
+1
12.22
2
pass
1708½
pass
1710¼
+2
13.17
2
pass
1710
pass
1711¾
+1
14.08
pass
1711
pass
1712¾
+1
DF
DRH
15.07
2
pass
1712
pass
1713½
+1
18.63
2
pass
1715½
pass
1716¼
+1
20.44
3
pass
1717
pass
1718¼
+1
DRH
DT
22.51
pass
1719
No report
26.17
2
pass
1722½
pass
1724¼
+1
DT
31.07
2
pass
1727
pass
1727½
36.07
pass
1731
No report
37.60
pass
1732
No report
39.31
pass
1733½
No report
40.20
1
1735
1738
1734½
1738
1737
1738
DRR
DH
41.01
pass
1739½
pass
1740¼
DD
43.48
2
1743
1744
1743
1744
1743¼
1744½
44.34
pass
1745½
pass
1746½
+1
DH
UH
45.10
1
1748
1747½
1748
UH