2F29 1220 London Waterloo to Woking
Departing on 7th January 2026

operated by
South Western Railway
8 coaches
450025
450112
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
10
1220
1220
1220
DMF
0.40
pass
1221½
pass
1221¾
DMF
DMS
1.29
8
1223
1224
1223
1224
1224¼
1225¼
+1
1.78
pass
1225
pass
1226½
+1
2.50
pass
1226
pass
1227¼
+1
3.26
pass
1227
pass
1227¾
+1
3.74
11
1228
1229
1228
1229
1229½
1230¼
+1
DMS
DS
5.46
3
1232
1232
1232
1232½
1233
1234
+1
7.19
8
1236
1236
1235½
1236½
1236¾
1237¾
+1
7.49
pass
1237½
pass
1238¾
+1
8.51
3
pass
1238½
pass
1240
+1
9.62
4
pass
1239½
pass
1241¼
+1
SL
10.78
2
pass
1241½
pass
1242¾
+1
12.03
4
1244
1244
1243½
1244½
1245½
1247¼
+2
DS
DS
13.26
pass
1246½
pass
1249½
+3
14.30
4
1248
1248
1248
1248½
1251
1252¼
+3
15.72
2
1251
1251
1251
1251½
1254½
1255½
+4
17.05
2
1254
1254
1253½
1254
1257¾
1258¾
+4
19.11
3
1257
1257
1257
1257½
1301¾
1303
+5
DS
DS
20.26
pass
1259
No report
20.31
2
1300
1300
1259½
1300
1304¾
1305¾
+5
DS
21.53
3
1303
1303
1302½
1303
1307½
1309½
+6
24.26
3
1308
1308
1315¼
+7
DS