2F33 1320 London Waterloo to Woking
Departing on 8th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701047
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
1
1320
1320
1319½
DMS
0.40
pass
1321½
pass
1321¼
1.29
8
1323
1324
1323
1324
1323¼
1324
1.78
pass
1325
pass
1325¼
2.50
pass
1326
pass
1326
3.26
pass
1327
pass
1326½
3.74
11
1328
1329
1328
1329
1328½
1328¾
DMS
DS
5.46
3
1332
1332
1332
1332½
1331¾
1332½
7.19
8
1336
1336
1335½
1336½
1336½
1337½
+1
7.49
pass
1337½
pass
1338½
+1
8.51
3
pass
1338½
pass
1340¼
+1
9.62
4
pass
1339½
pass
1341½
+2
SL
10.78
2
pass
1341½
pass
1342¾
+1
12.03
3
1344
1344
1343½
1344½
1344½
1345¼
DS
DS
13.26
pass
1346½
pass
1346¾
14.30
4
1348
1348
1348
1348½
1348¼
1349¼
15.72
2
1351
1351
1351
1351½
1351¾
1352½
+1
17.05
2
1354
1354
1353½
1354
1354½
1355¼
+1
19.11
3
1357
1357
1357
1357½
1358¼
1359
+1
DS
DS
20.26
pass
1359
No report
20.31
2
1400
1400
1359½
1400
1400¾
1401¾
+1
DS
21.53
3
1403
1403
1402½
1403
1403½
1405¼
+2
24.26
3
1408
1408
1410¾
+2
DS