2F37 1420 London Waterloo to Woking
Departing on 8th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701050
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
3
1420
1420
1419½
DMS
0.40
pass
1421½
pass
1421¼
1.29
8
1423
1424
1423
1424
1423¼
1424
1.78
pass
1425
pass
1425¼
2.50
pass
1426
pass
1426
3.26
pass
1427
pass
1426½
3.74
11
1428
1429
1428
1429
1428½
1428¾
DMS
DS
5.46
3
1432
1432
1432
1432½
1431¾
1432½
7.19
8
1436
1436
1435½
1436½
1435½
1436¼
7.49
pass
1437½
pass
1437
8.51
3
pass
1438½
pass
1438¼
9.62
4
pass
1439½
pass
1439½
SL
10.78
2
pass
1441½
pass
1440¾
12.03
3
1444
1444
1443½
1444½
1443¼
1444¼
DS
DS
13.26
pass
1446½
pass
1446
14.30
4
1448
1448
1448
1448½
1447½
1448¾
15.72
2
1451
1451
1451
1451½
1451
1451¾
17.05
2
1454
1454
1453½
1454
1453¾
1454½
19.11
3
1457
1457
1457
1457½
1457½
1458¼
DS
DS
20.26
pass
1459
No report
20.31
2
1500
1500
1459½
1500
1500¼
1501
+1
DS
21.53
3
1503
1503
1502½
1503
1502½
1504¼
+1
24.26
3
1508
1508
1509½
+1
DS