2F53 1820 London Waterloo to Woking
Departing on 12th January 2026

operated by
South Western Railway
8 coaches
450049
450080
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
3
1820
1820
1822½
+2
DMS
0.40
pass
1821½
pass
1824¼
+2
1.29
8
1823
1824
1823
1824
1826¼
1827¼
+3
1.78
pass
1825
pass
1828½
+3
2.50
pass
1826
pass
1829¼
+3
3.26
pass
1827
pass
1829¾
+3
3.74
11
1828
1829
1828
1829
1831½
1832¼
+3
DMS
DS
5.46
3
1832
1832
1832
1832½
1835¼
1836¼
+3
7.19
8
1836
1836
1835½
1836½
1839
1840¼
+3
7.49
pass
1837½
pass
1841
+3
8.51
3
pass
1838½
pass
1842½
+4
9.62
4
pass
1839½
pass
1843¾
+4
SL
10.78
2
pass
1841½
pass
1845
+3
12.03
4
1844
1845
1843½
1845½
1847½
1849
+3
DS
DS
13.26
pass
1847½
pass
1851½
+4
14.30
4
1849
1849
1849
1849½
1853
1854¾
+5
15.72
2
1852
1853
1852
1853
1857
1858¼
+5
17.05
2
1855
1856
1855
1856
1900¼
1901½
+5
19.11
3
1859
1900
1859
1900
1904½
1905½
+5
DS
DS
20.26
pass
1901½
No report
20.31
2
1902
1902
1902
1902½
1907¼
1908¼
+5
DS
21.53
3
1905
1905
1905
1905½
1910
1911¾
+6
24.26
3
1912
1910
1917
+7
DS