2F61 2020 London Waterloo to Woking
Departing on 6th January 2026

operated by
South Western Railway
8 coaches
450054
450079
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
6
2020
2020
2021
+1
DMS
0.40
pass
2021½
pass
2022¾
+1
1.29
8
2023
2024
2023
2024
2025¼
2026½
+2
1.78
pass
2025
pass
2027¾
+2
2.50
pass
2026
pass
2028½
+2
3.26
pass
2027
pass
2029¼
+2
3.74
11
2028
2029
2028
2029
2031¼
2031¾
+2
DMS
DS
5.46
3
2032
2032
2032
2032½
2034¾
2035¾
+3
7.19
8
2036
2036
2035½
2036½
2038½
2039½
+3
7.49
pass
2037½
pass
2040¼
+3
8.51
3
pass
2038½
pass
2041¾
+3
9.62
4
pass
2039½
pass
2043
+3
SL
10.78
2
pass
2041½
pass
2044¼
+3
12.03
4
2044
2044
2043½
2044½
2047¼
2048¼
+3
DS
DS
13.26
pass
2046½
pass
2050½
+4
14.30
4
2048
2048
2048
2048½
2052
2053½
+5
15.72
2
2051
2051
2051
2051½
2055¾
2057
+5
17.05
2
2054
2054
2053½
2054
2059
2100
+6
19.11
3
2057
2057
2057
2057½
2103
2104¼
+6
DS
DS
20.26
pass
2059
No report
20.31
2
2100
2100
2059½
2100
2106¼
2107¼
+7
DS
21.53
3
2103
2103
2102½
2103
2109
2111
+8
24.26
3
2108
2108
2116¼
+8
DS