2F71 2250 London Waterloo to Woking
Departing on 3rd January 2026

operated by
South Western Railway
Arterio (10 coaches)
701034
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
1
2250
2250
2251
+1
DMS
0.40
pass
2251½
pass
2252½
+1
1.29
8
2253
2254
2253
2254
2254½
2255½
+1
1.78
pass
2255
pass
2256½
+1
2.50
pass
2256
pass
2257¼
+1
3.26
pass
2257
pass
2258
+1
3.74
11
2258
2259
2258
2259
2259¾
2300
+1
DMS
DS
5.46
3
2302
2302
2302
2302½
2302½
2303¼
7.19
8
2306
2306
2305½
2306½
2305¾
2306½
7.49
pass
2307½
pass
2307¼
8.51
3
pass
2308½
pass
2308½
9.62
4
pass
2309½
pass
2309¾
SL
10.78
2
pass
2311½
pass
2311
12.03
3
2314
2314
2313½
2314½
2312½
2314½
DS
DS
13.26
pass
2316½
pass
2316¼
14.30
4
2318
2318
2318
2318½
2317¾
2318¾
15.72
2
2321
2321
2321
2321½
2321
2321¾
17.05
2
2324
2324
2323½
2324
2323¾
2324½
19.11
3
2327
2327
2327
2327½
2327¼
2328
DS
DS
20.26
pass
2329
No report
20.31
2
2330
2330
2329½
2330
2329¾
2330½
DS
21.53
3
2333
2333
2332½
2333
2332¼
2333¾
24.26
3
2338
2338
2338¾
DS