2F73 2320 London Waterloo to Woking
Departing on 3rd January 2026

operated by
South Western Railway
Arterio (10 coaches)
701030
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
1
2320
2320
2319½
DMS
0.40
pass
2321½
pass
2321
1.29
8
2323
2324
2323
2324
2322¾
2323¾
1.78
pass
2325
pass
2325
2.50
pass
2326
pass
2325¾
3.26
pass
2327
pass
2326¼
3.74
11
2328
2329
2328
2329
2328
2328½
DMS
DS
5.46
3
2332
2332
2332
2332½
2331¼
2332¼
7.19
8
2336
2336
2335½
2336½
2334¾
2335¾
7.49
pass
2337½
pass
2336½
8.51
3
pass
2338½
pass
2337¾
9.62
4
pass
2339½
pass
2339
SL
10.78
2
pass
2341½
pass
2340
-1
12.03
3
2344
2344
2343½
2344½
2341¾
2343¾
DS
DS
13.26
pass
2346½
pass
2345½
14.30
4
2348
2348
2348
2348½
2346¾
2348
15.72
2
2351
2351
2351
2351½
2350¼
2351¼
17.05
2
2354
2354
2353½
2354
2353¼
2354
19.11
3
2357
2357
2357
2357½
2357
2357¾
DS
DS
20.26
pass
2359
No report
20.31
2
2359
2359
2359½
2359½
2359½
0000¼
DS
21.53
3
0003
0003
0002½
0003
0002
0003½
24.26
Approaching
Woking [WOK]
1
0008
0008
0012¾
+4
DS