2F87 0750 London Waterloo to Guildford
Departing on 8th January 2026

operated by
South Western Railway
8 coaches
450022
450085
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
6
0750
0750
0749½
DMS
0.40
pass
0751½
pass
0751¼
1.29
8
0753
0754
0753
0754
0753
0754¼
1.78
pass
0755
pass
0755¼
2.50
pass
0756
pass
0756
3.26
pass
0757
pass
0756¾
3.74
11
0758
0759
0758
0759
0758¼
0758¾
DMS
DS
5.46
3
0802
0802
0802
0802½
0801½
0802½
7.19
8
0806
0806
0805½
0806½
0805¼
0806¾
7.49
pass
0807½
pass
0807½
8.51
3
pass
0808½
pass
0808¾
9.62
4
pass
0809½
pass
0810
SL
10.78
2
pass
0811½
pass
0811
12.03
4
0814
0814
0813½
0814½
0813¼
0814¾
DS
DS
13.26
pass
0816½
pass
0817
14.30
4
0818
0818
0818
0818½
0818½
0820
+1
15.72
2
0821
0821
0821
0821½
0822¼
0823
+1
17.05
2
0824
0824
0823½
0824
0825
0826
+2
19.11
3
0827
0827
0827
0827½
0828¾
0829¾
+2
DS
DS
20.26
pass
0829
No report
20.31
2
0830
0830
0829½
0830
0831¾
0832½
+2
DS
21.53
3
0833
0833
0832½
0833
0834¼
0835¾
+2
24.26
5
0837
0839
0837
0839
0839¾
0840½
+1
DS
24.61
pass
0840
pass
0841½
+1
DS
DG
26.54
2
pass
0843½
pass
0843¾
30.26
2
0850
0850
0849½
DG