2H07 0642 London Waterloo to Shepperton
Departing on 7th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701052
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
2
0642
0642
0643
+1
DMS
0.40
pass
0643½
pass
0644½
+1
1.29
8
0645
0646
0645
0646
0647¼
0648¼
+2
1.78
pass
0647
pass
0649½
+2
2.50
pass
0648
pass
0650¼
+2
3.26
pass
0649
pass
0651
+2
3.74
11
0650
0651
0650
0651
0653¼
0653½
+2
DMS
DS
5.46
3
pass
0654
pass
0657
+2
7.19
8
0658
0658
0657½
0658½
0700
0701
+2
7.49
pass
0659½
pass
0701¾
+2
8.51
3
0701
0701
0701
0701½
0703½
0704
+2
9.62
4
0704
0704
0703½
0704
0706¼
0706¾
+2
DS
DK
11.24
2
0707
0707
0707
0707½
0709¾
0710½
+3
12.09
2
0710
0710
0709½
0710½
0712
0712¾
+2
DK
12.44
2
0712
0712
0712
0712½
0713¾
0714½
+2
13.54
1
0715
0715
0714½
0715
0716¾
0717½
+2
14.29
pass
0717
pass
0718¾
+1
DK
DS
14.53
pass
0718
pass
0719¾
+2
14.72
2
0719
0719
0719
0719½
0720¾
0721¼
+1
16.44
2
0723
0723
0722½
0723
0724
0724½
+1
18.25
2
pass
0726½
pass
0727¾
+1
18.61
2
0728
0728
0727½
0728
0727¾
0728¼
19.31
2
0730
0730
0729½
0730
0729¾
0730¾
20.70
1
0735
0733
0733½
DS