2H18 0811 Shepperton to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701050
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
0811
0811
0810¾
US
1.39
1
0814
0814
0814
0814½
0813¾
0814½
2.09
1
0816
0816
0816
0816½
0815¾
0816½
2.45
1
pass
0817½
pass
0817¼
4.26
1
0820
0820
0820
0820½
0819¾
0820
5.78
1
0823
0823
0823
0823½
0822¾
0823½
6.17
pass
0825
pass
0824
6.41
pass
0826
pass
0824¾
-1
US
UK
7.16
2
0828
0828
0827½
0828
0826¾
0827½
8.26
1
0830
0830
0830
0830½
0829½
0830
8.61
3
0832
0833
0832
0833
0831½
0832¾
9.46
1
0835
0835
0834½
0835½
0834½
0835¼
11.08
1
0839
0840
0839
0840
0840¼
0840¾
UK
US
12.19
2
0843
0843
0842½
0843½
0843¾
0844½
+1
13.21
pass
0845½
pass
0846½
+1
13.51
5
0847
0847
0846½
0847½
0847¾
0848½
+1
US
14.42
pass
0849½
pass
0850½
+1
15.24
2
0851
0852
0851
0852
0852½
0853¼
+1
16.76
10
0855
0856
0855
0856
0855¾
0856¾
US
UMS
17.44
pass
0857
pass
0858
18.20
pass
0858
pass
0858½
18.72
pass
0859
pass
0859½
19.41
7
0900
0901
0900
0901
0900¾
0901¾
20.30
pass
0903
pass
0903¼
20.70
5
0907
0905
0905¼
UMS