2H22 0911 Shepperton to London Waterloo
Departing on 3rd January 2026

operated by
South Western Railway
Arterio (10 coaches)
701017
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
0911
0911
0910¾
US
1.39
1
0914
0914
0914
0914½
0913¾
0914¼
2.09
1
0916
0916
0916
0916½
0915¾
0916¼
2.45
1
0918
0918
0917½
0918
0917½
0918
4.26
1
0921
0921
0921
0921½
0921
0921
5.78
1
0924
0924
0924
0924½
0924¼
0925
6.17
pass
0926
pass
0925½
6.41
pass
0927
pass
0926¼
US
UK
7.16
2
0929
0929
0928½
0929
0928¼
0928¾
8.26
1
0931
0931
0931
0931½
0931
0931½
8.61
3
0933
0934
0933
0934
0932¾
0933½
9.46
1
0936
0936
0935½
0936
0935¼
0936
11.08
1
0940
0940
0939½
0940
0939¼
0939¾
UK
US
12.19
2
0942
0943
0942
0943
0942
0942¾
13.21
pass
0945
pass
0944½
13.51
5
0946
0947
0946
0947
0945½
0946½
US
14.42
pass
0949
pass
0948¼
15.24
2
pass
0950½
pass
0949¾
16.76
10
0954
0954
0953½
0954½
0953¾
0954¾
US
UMS
17.44
pass
0955½
pass
0955¾
18.20
pass
0956½
pass
0956½
18.72
pass
0957½
pass
0957¼
19.41
7
0959
0959
0958½
0959½
0959
0959¾
20.30
pass
1001½
pass
1001
20.70
5
1005
1004
1005¼
+1
UMS