2H26 1011 Shepperton to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701050
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
1011
1011
1010¾
US
1.39
1
1014
1014
1014
1014½
1013¾
1014¼
2.09
1
1016
1016
1016
1016½
1015¾
1016½
2.45
1
1018
1018
1017½
1018
1017½
1018
4.26
1
1021
1021
1021
1021½
1021
1021
5.78
1
1024
1024
1024
1024½
1024
1024¾
6.17
pass
1026
pass
1025¼
6.41
pass
1027
pass
1026¼
US
UK
7.16
2
1029
1029
1028½
1029
1028¼
1029¼
8.26
1
1031
1031
1031
1031½
1031¼
1031¾
8.61
3
1033
1034
1033
1034
1033¼
1034½
9.46
1
1036
1036
1035½
1036
1036¼
1037¼
+1
11.08
1
1040
1040
1039½
1040
1040
1040¾
UK
US
12.19
2
1042
1043
1042
1043
1043
1043¾
13.21
pass
1045
pass
1045¾
13.51
5
1046
1047
1046
1047
1046¾
1047½
US
14.42
pass
1049
pass
1049¼
15.24
2
pass
1050½
pass
1050¾
16.76
10
1054
1054
1053½
1054½
1053¼
1054¼
US
UMS
17.44
pass
1055½
pass
1055¼
18.20
pass
1056½
pass
1056
18.72
pass
1057½
pass
1056¾
19.41
7
1059
1059
1058½
1059½
1058½
1059¼
20.30
pass
1101½
pass
1101
20.70
5
1104
1104
1102¾
-1
UMS