2H28 1041 Shepperton to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701037
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
1041
1041
1040¾
US
1.39
1
1044
1044
1044
1044½
1044
1044½
2.09
1
1046
1046
1046
1046½
1046
1047
2.45
1
1048
1048
1047½
1048
1048¼
1049
+1
4.26
1
1051
1051
1051
1051½
1051¾
1052
5.78
1
1054
1054
1054
1054½
1055¼
1056
+1
6.17
pass
1056
pass
1056½
6.41
pass
1057
pass
1057½
US
UK
7.16
2
1059
1059
1058½
1059
1059½
1100¼
+1
8.26
1
1101
1101
1101
1101½
1102½
1103¼
+1
8.61
3
1103
1104
1103
1104
1104½
1105½
+1
9.46
1
1106
1106
1105½
1106
1107¼
1108
+2
11.08
1
1110
1110
1109½
1110
1111
1112
+2
UK
US
12.19
2
1112
1113
1112
1113
1114¼
1114¾
+1
13.21
pass
1115
pass
1116½
+1
13.51
5
1116
1117
1116
1117
1117½
1118¼
+1
US
14.42
pass
1119
pass
1120
+1
15.24
2
pass
1120½
pass
1121½
+1
16.76
10
1124
1124
1123½
1124½
1124¼
1125
US
UMS
17.44
pass
1125½
pass
1126¼
18.20
pass
1126½
pass
1126¾
18.72
pass
1127½
pass
1127½
19.41
7
1129
1129
1128½
1129½
1129
1130
20.30
pass
1131½
pass
1132
20.70
6
1134
1134
1134¼
UMS