2H30 1111 Shepperton to London Waterloo
Departing on 6th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701039
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
1111
1111
1111
US
1.39
1
1114
1114
1114
1114½
1114¼
1114¾
2.09
1
1116
1116
1116
1116½
1116
1116¾
2.45
1
1118
1118
1117½
1118
1118
1118½
4.26
1
1121
1121
1121
1121½
1121¼
1122
5.78
1
1124
1124
1124
1124½
1124½
1125¼
6.17
pass
1126
pass
1126
6.41
pass
1127
pass
1126¾
US
UK
7.16
2
1129
1129
1128½
1129
1128½
1129¼
8.26
1
1131
1131
1131
1131½
1131¼
1132
8.61
3
1133
1134
1133
1134
1133½
1134¼
9.46
1
1136
1136
1135½
1136
1136
1136½
11.08
1
1140
1140
1139½
1140
1139½
1140¼
UK
US
12.19
2
1142
1143
1142
1143
1142¼
1142¾
13.21
pass
1145
pass
1144½
13.51
5
1146
1147
1146
1147
1145¼
1146½
US
14.42
pass
1149
pass
1148¼
15.24
2
pass
1150½
pass
1149½
16.76
10
1154
1154
1153½
1154½
1151¾
1153½
US
UMS
17.44
pass
1155½
pass
1154¾
18.20
pass
1156½
pass
1155¼
-1
18.72
pass
1157½
pass
1156
-1
19.41
7
1159
1159
1158½
1159½
1157¼
1158¾
20.30
pass
1201½
pass
1200¼
-1
20.70
1
1204
1204
1202
-1
UMS