2H58 1811 Shepperton to London Waterloo
Departing on 4th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701050
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
1811
1811
1810¾
US
1.39
1
1814
1814
1814
1814½
1814
1814½
2.09
1
1816
1816
1816
1816½
1815¾
1816¾
2.45
1
1818
1818
1817½
1818
1818
1818½
4.26
1
1821
1821
1821
1821½
1821¼
1821
5.78
1
1824
1824
1824
1824½
1824½
1825¼
6.17
pass
1826
pass
1825¾
6.41
pass
1827
pass
1826½
US
UK
7.16
2
1829
1829
1828½
1829
1828½
1829
8.26
1
1831
1831
1831
1831½
1831¼
1831¾
8.61
3
1833
1834
1833
1834½
1833
1834
9.46
1
1836
1836
1836
1836½
1835¾
1836½
11.08
1
1840
1840
1840
1840½
1839¼
1840
UK
US
12.19
2
1843
1843
1842½
1843
1842
1843
13.21
pass
1845
pass
1844½
13.51
5
1846
1847
1846
1847
1845½
1846½
US
14.42
pass
1848½
pass
1848¼
15.24
2
1850
1850
1850
1850½
1850
1850½
16.76
10
1854
1854
1853½
1854½
1853
1854
US
UMS
17.44
pass
1855½
pass
1855
18.20
pass
1856½
pass
1855¾
18.72
pass
1857½
pass
1856½
19.41
7
1859
1859
1858½
1859½
1857¾
1858¾
20.30
pass
1901½
pass
1900¼
-1
20.70
4
1904
1904
1902¼
-1
UMS