2H60 1836 Shepperton to London Waterloo
Departing on 9th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701026
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
1836
1836
1835¾
US
1.39
1
1839
1839
1839
1839½
1839
1839½
2.09
1
1841
1841
1841
1841½
1841
1842
2.45
1
1843
1843
1842½
1843
1843¼
1844
+1
4.26
1
1846
1851
1846
1851
1846¾
1850
-1
5.78
1
1854
1854
1853½
1854
1853¼
1854
6.17
pass
1855½
pass
1854¾
6.41
pass
1856½
pass
1855½
US
UK
7.16
2
1858
1859
1858
1859
1857½
1858¾
8.26
1
1901
1901
1901
1901½
1901
1901¾
8.61
3
1903
1904
1903
1904
1903
1903¾
9.46
1
1906
1906
1905½
1906
1905½
1906½
11.08
1
1910
1910
1909½
1910
1909¾
1910½
UK
US
12.19
2
1912
1913
1912
1913
1912½
1913¼
13.21
pass
1915
pass
1915
13.51
5
1916
1917
1916
1917
1916
1916¾
US
14.42
pass
1919
pass
1918½
15.24
2
pass
1920½
pass
1920
16.76
10
1924
1924
1923½
1924½
1923¼
1924½
US
UMS
17.44
pass
1925½
pass
1925¾
18.20
pass
1926½
pass
1926½
18.72
pass
1927½
pass
1927½
19.41
7
1929
1929
1928½
1929½
1928¾
1929¾
20.30
pass
1931½
pass
1932
20.70
5
1934
1934
1934
UMS