2U25 1033 London Waterloo to Windsor & Eton Riverside
Departing on 6th January 2026

operated by
South Western Railway
8 coaches
458402
458414
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
1033
1033
1035¼
+2
WR1
0.40
pass
1034½
pass
1036¾
+2
WR1
DWF
1.29
3
1037
1037
1036½
1037½
1038¾
1039½
+2
1.78
pass
1039
pass
1040½
+1
DWF
DW
2.50
3
pass
1040
pass
1041½
+1
DW
DWS
3.17
pass
1040½
pass
1042¼
+1
3.74
6
1042
1043
1042
1043
1043¾
1044½
+1
DWS
DWS
4.60
1
pass
1044½
pass
1046¼
+1
5.72
4
1046
1047
1046
1047
1047¾
1048¼
+1
7.07
4
pass
1049
pass
1050½
+1
DWS
DR
8.21
2
pass
1050
pass
1051½
+1
9.03
2
pass
1051
pass
1052¼
+1
9.57
1
1052
1053
1052
1053
1053¼
1054¼
+1
DR
DT
10.66
3
pass
1055
pass
1056
+1
11.22
5
1056
1057
1056
1057
1057
1057¾
11.49
pass
1058
pass
1058½
12.43
2
1100
1100
1059½
1100
1100
1100¾
13.03
pass
1101
pass
1101¾
13.35
pass
1101½
pass
1102
14.68
2
1104
1104
1103½
1104½
1104
1105¼
17.40
2
1108
1108
1108
1108½
1108½
1109¼
19.02
2
1111
1112
1111½
1112½
1111¾
1112½
DT
DW
21.40
2
1116
1116
1116
1116½
1116
1117
22.48
2
1119
1119
1118½
1119
1119
N/R
23.63
2
1122
1122
1121½
1122
N/R
1122