5J90 0635 Wimbledon Park Depot Sdgs to London Waterloo
Departing on 8th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701041
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0635
0633
-2
EFD
0.00
0640
0640
N/R
0635
-5
UF
0.58
pass
0641½
pass
0637
-4
2.30
8
pass
0644½
pass
0641¼
-3
UF
UMF
2.78
pass
0645½
pass
0642½
-2
3.54
pass
0646
pass
0643½
-2
4.26
pass
0647
pass
0644¼
-2
4.75
5
pass
0648
pass
0645¾
-2
5.64
pass
0649
pass
0647
-1
UMF
UMR
6.24
9
0651
0651¾
UMR