5J90 0635 Wimbledon Park Depot Sdgs to London Waterloo
Departing today

operated by
South Western Railway
Arterio (10 coaches)
701048
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Wimbledon Park Depot Sdgs
Pathed as Electric multiple unit at 75mph
0635
0635
EFD
0.00
0640
0640
N/R
0636
-4
UF
0.58
pass
0641½
pass
0639¼
-2
2.30
8
pass
0644½
pass
0641¾
-2
UF
UMF
2.78
pass
0645½
pass
0642½
-2
3.54
pass
0646
pass
0643¼
-2
4.26
pass
0647
pass
0644
-3
4.75
5
pass
0648
pass
0645¼
-2
5.64
pass
0649
pass
0648¾
6.24
9
0651
0651¼
UMF