5U07 0540 Feltham Depot to Twickenham
Departing on 14th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701018
WTT
RTTRealtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
Feltham Depot
Pathed as Electric multiple unit at 75mph
0540
0536
-4
ARR
Feltham Arr Rd Country End
Service reverses here
0547½
0554½
0543
0548¼
-6
Feltham Arr Rd London End
Service stops for pathing (passing train)
0556
0608½
0550
0607
-1
ARR
UT
pass
0611½
pass
0610½
pass
0612
pass
0611
1
pass
0614
pass
0612
-2
pass
0618
pass
0617¼
SL
3
0619
0617¾
-1
UT