5Y67 2357 Shepperton to Wimbledon Park Depot Sdgs
Departing on 4th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701050
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Shepperton [SHP]
Pathed as Electric multiple unit at 75mph
1
2357
2354¼
-2
US
1.39
1
pass
2359½
pass
2357¾
-1
2.09
1
pass
0000½
pass
2358½
-1
2.45
1
pass
0001
pass
2358
-2
4.26
1
pass
0003½
pass
2359¾
-3
5.78
1
pass
0005½
pass
0002
-3
6.17
pass
0009½
pass
0002½
-7
6.41
pass
0015
pass
0005¾
-9
US
UK
7.16
2
pass
0016
pass
0008
-7
8.26
1
pass
0018
pass
0010
-7
8.61
3
pass
0018½
pass
0011
-7
9.46
1
pass
0020
pass
0012
-7
11.08
1
pass
0022½
pass
0015
-7
UK
US
12.19
2
pass
0028½
pass
0017½
-10
13.21
pass
0032
pass
0019½
-12
13.51
Wimbledon [WIM]
Service stops for pathing (passing train)
5
0033½
0034
0021¼
0022¼
-11
US
SDG
14.48
0036
0036
No report
WDN