5G30 2319 Northallerton to Heaton T&R.S.M.D.
Departing on 7th January 2026

operated by
LNER
Azuma (9 coaches)
801208
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Northallerton [NTR]
Pathed as Class 80x on electric at 125mph
2
2319
2329½
+10
DM
7.34
pass
2325½
No report
13.65
pass
2330½
pass
2339¼
+8
14.14
D
2331½
2357
2339¾
2354¾
-2
DM
DM
14.40
pass
2357½
pass
2354¾
-2
19.40
pass
0001
No report
23.39
pass
0003½
No report
26.21
pass
0005½
pass
0005¾
28.75
pass
0007
pass
0008
+1
36.17
DM
pass
0012½
pass
0015¼
+2
41.76
2
pass
0017
pass
0018¾
+1
45.33
pass
0020
pass
0020½
47.44
pass
0029
pass
0022½
-6
49.46
pass
0038
pass
0026½
-11
49.61
pass
0039
pass
0027¼
-11
50.20
2
0042
0058
0031¼
0043¾
-14
DM
UM
50.66
1
pass
0100
pass
0045¾
-14
UM
UM
52.05
pass
0104
pass
0056½
-7
UM
DPT
52.40
0108
0057½
-10
UM