2F51 1828 London Bridge to London Victoria
Departing on 12th January 2026

operated by
Southern
8 coaches
377142
377474
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
12
1828
1828
1827¾
9
0.30
pass
1829½
pass
1828¾
0.55
pass
1830
pass
1829
1.04
pass
1830½
pass
1830¼
9
DSS
1.45
pass
1831½
No report
2.00
pass
1832½
pass
1831½
DSS
DS
2.58
2
1834
1834
1833½
1834½
1832¼
1834½
DS
DS
3.44
2
1837
1837
1836½
1837
1836¼
1837¼
4.47
2
1839
1839
1839
1839½
1839¼
1840½
+1
5.38
2
1842
1842
1841½
1842
1842¼
1843
+1
6.20
2
1845
1845
1844½
1845½
1844¾
1845¾
DS
DSY
7.40
4
1850
1856
1850
1856½
1850
1856
DSY
UCP
8.19
1
1859
1859
1858½
1859
1858¼
1859
9.10
1
1902
1902
1901½
1902
1901¼
1902
9.34
pass
1903
pass
1903
9.61
pass
1903½
pass
1903¾
10.35
1
1906
1906
1905½
1906½
1905¼
1906
UCP
11.23
pass
1909
pass
1907¾
-1
11.40
2
1910
1911
1910
1911
1908½
1910¾
UCP
UBS
12.07
2
1913
1913
1912½
1913
1912
1912¾
13.35
14
1916
1917
1916
1917
1915¾
1916¼
UBS
14.08
pass
1918½
pass
1917¾
14.69
4
1920
1921
1920
1921
1919¼
1920¼
15.19
pass
1922
pass
1921¼
15.20
pass
1922
No report
16.12
10
1925
1925
1924
UBS