2F53 1858 London Bridge to London Victoria
Departing on 6th January 2026

operated by
Southern
8 coaches
377118
377467
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Bridge [LBG]
Pathed as Electric multiple unit at 100mph
12
1858
1858
1857¾
9
0.30
pass
1859½
pass
1859
0.55
pass
1900
pass
1859¼
1.04
pass
1900½
pass
1900¼
9
DSS
1.45
pass
1901½
No report
2.00
pass
1902½
pass
1901½
DSS
DS
2.58
2
1904
1904
1903½
1904½
1902½
1903¾
DS
DS
3.44
2
1907
1907
1906½
1907
1905½
1906¾
4.47
2
1909
1909
1909
1909½
1908¾
1909½
5.38
2
1912
1912
1911½
1912
1911¼
1912¼
6.20
2
1915
1915
1914½
1915½
1914
1915
DS
DSY
7.40
4
1920
1926
1919½
1926½
1918
1925¾
DSY
UCP
8.19
1
1929
1929
1928½
1929
1928¼
1928¾
9.10
1
1932
1932
1931½
1932
1931
1931½
9.34
pass
1933
pass
1932¾
9.61
pass
1934
pass
1933¼
10.35
1
1936
1937
1936
1937
1935
1936¾
UCP
11.23
pass
1939
pass
1939
11.40
2
1940
1940
1940
1940½
1940
1940¾
UCP
UBS
12.07
2
1942
1942
1942
1942½
1942¼
1942¾
13.35
14
1946
1946
1945½
1946½
1945¾
1946½
UBS
14.08
pass
1948
pass
1948
14.69
4
1950
1950
1949½
1950
1949½
1950¼
15.19
pass
1951
pass
1951¼
15.20
pass
1951
No report
16.12
9
1954
1954
1954¾
UBS