2F51 1750 London Waterloo to Woking
Departing on 3rd January 2026

operated by
South Western Railway
8 coaches
450002
450033
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
2
1750
1750
1753
+3
DMS
0.40
pass
1751½
pass
1754¾
+3
1.29
8
1753
1754
1753
1754
1756¾
1758
+4
1.78
pass
1755
pass
1759
+4
2.50
pass
1756
pass
1759¾
+3
3.26
pass
1757
pass
1800½
+3
3.74
11
1758
1759
1758
1759
1802¼
1802¾
+3
DMS
DS
5.46
3
1802
1802
1802
1802½
1805½
1806¼
+3
7.19
8
1806
1806
1805½
1806½
1809¼
1810¼
+3
7.49
pass
1807½
pass
1811
+3
8.51
3
pass
1809
pass
1812½
+3
9.62
4
pass
1810
pass
1813½
+3
SL
10.78
2
pass
1812
pass
1814½
+2
12.03
3
1814
1815
1814
1815
1816
1817
+2
DS
DS
13.26
pass
1817
pass
1818¾
+1
14.30
4
1819
1819
1818½
1819
1820¼
1821½
+2
15.72
2
1822
1822
1821½
1822
1823¾
1824¾
+2
17.05
2
1824
1824
1824
1824½
1826¾
1827¾
+3
DS
19.11
3
1828
1828
1827½
1828
1830¾
1831½
+3
DS
DS
20.26
pass
1829½
No report
20.31
2
1830
1830
1830
1830½
1833½
1834¼
+3
DS
21.53
3
1833
1833
1833
1833½
1836
1837¾
+4
24.26
3
1838
1838
1842¾
+4
DS