2F57 1916 London Waterloo to Woking
Departing on 10th January 2026

operated by
South Western Railway
Arterio (10 coaches)
701050
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
5
1916
1916
1916
DMS
0.40
pass
1917½
pass
1917¾
1.29
8
pass
1918½
pass
1919½
1.78
pass
1919½
pass
1920¼
+1
2.50
pass
1920½
pass
1921
3.26
pass
1921
pass
1921¾
3.74
11
1923
1923
1922½
1923½
1923½
1924
DMS
DS
5.46
3
1927
1927
1926½
1927
1926¾
1927½
7.19
8
1930
1931
1930
1931
1931
1932
+1
7.49
pass
1932
pass
1932¾
8.51
3
1934
1934
1933½
1934
1934½
1935¼
+1
9.62
4
1936
1936
1936
1936½
1937¼
1937¾
+1
SL
10.78
2
1940
1940
1939½
1940
1940¼
1940¾
12.03
3
1943
1944
1943
1944½
1942¾
1944
DS
DS
13.26
pass
1946½
pass
1945¾
14.30
4
1948
1948
1948
1948½
1947¼
1948½
15.72
2
1951
1951
1951
1951½
1950¾
1951¾
17.05
2
1954
1954
1953½
1954
1953¾
1955
+1
19.11
3
1957
1957
1957
1957½
1958
1958¾
+1
DS
DS
20.26
pass
1959
No report
20.31
2
2000
2000
1959½
2000
2000¾
2001½
+1
DS
21.53
3
2003
2003
2002½
2003
2003¼
2006
+3
24.26
3
2008
2008
2010¾
+2
DS