2F61 2020 London Waterloo to Woking
Departing on 3rd January 2026

operated by
South Western Railway
8 coaches
450072
450093
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
5
2020
2020
2027¼
+7
DMS
0.40
pass
2021½
pass
2028¾
+7
1.29
8
2023
2024
2023
2024
2030½
2031½
+7
1.78
pass
2025
pass
2032¾
+7
2.50
pass
2026
pass
2033½
+7
3.26
pass
2027
pass
2034
+7
3.74
11
2028
2029
2028
2029
2035¾
2036½
+7
DMS
DS
5.46
3
2032
2032
2032
2032½
2039¼
2040¼
+7
7.19
8
2036
2036
2035½
2036½
2043
2043¾
+7
7.49
pass
2037½
pass
2044¾
+7
8.51
3
pass
2039
pass
2046
+7
9.62
4
pass
2040
pass
2047¼
+7
SL
10.78
2
pass
2042
pass
2048½
+6
12.03
3
2044
2045
2044
2045
2050¼
2051¼
+6
DS
DS
13.26
pass
2047
pass
2053
+6
14.30
4
2049
2049
2048½
2049
2054½
2055¾
+6
15.72
2
2052
2052
2051½
2052
2058
2059¼
+7
17.05
2
2054
2054
2054
2054½
2101¼
2102¼
+7
19.11
3
2058
2058
2057½
2058
2105¼
2106¼
+8
DS
DS
20.26
pass
2059½
No report
20.31
2
2100
2100
2100
2100½
2108
2109
+8
DS
21.53
3
2103
2103
2103
2103½
2110¾
2112½
+9
24.26
3
2108
2108
2117¾
+9
DS